Explore our ready-made packages or use the cost estimator to plan your project with clarity. Whether you're starting small or going big, we help you understand what to expect — no surprises, just clear pricing.
Essential
1. Compound wall, sump, septic tank, RWH, soak pits, tapered slabs, weathering course, main gate, safety grill gate, ladder, lofts, elevations with any cladding, CNC cutting, jaali, RCC/MS pergolas, projections, light fittings, landscaping, setback finish, chimney, lift, lift pit, circular/helical staircase, solar heater provision, CCTV wiring, pressure motor provision, meter board, ceiling lights will only be charged if required by the client. Any other specifications or works not exclusively mentioned above as per packages will only be charged additionally if required.
2. Large format tile laying (above 2x2), marble/laying will be charged additionally as per client’s requirement.
3. Water connection, borewell, EB connection, building and planning approval, corporation tax, electrical fittings, government/local body charges (i.e., political parties) will be in client’s scope. We can coordinate and help with liaison if required.
Essential Plus
Popular Choice
1. Compound wall, sump, septic tank, RWH, soak pits, tapered slabs, weathering course, main gate, safety grill gate, ladder, lofts, elevations with any cladding, CNC cutting, jaali, RCC/MS pergolas, projections, light fittings, landscaping, setback finish, chimney, lift, lift pit, circular/helical staircase, solar heater provision, CCTV wiring, pressure motor provision, meter board, ceiling lights will only be charged if required by the client. Any other specifications or works not exclusively mentioned above as per packages will only be charged additionally if required.
2. Large format tile laying (above 6’x4’), marble/laying will be charged additionally as per client’s requirement.
3. Water connection, borewell, EB connection, building and planning approval, corporation tax, electrical fittings, government/local body charges (i.e., political parties) will be in client’s scope. We can coordinate and help with liaison if required.
Area calculation:
4. Car parking will be charged 80% of the built-up area.
5. Headroom will be charged at 90% of the built-up area.
6. Measurements for the super built-up area will be taken jointly.
7. Site dewatering, site pooja and site cleaning will be charged only if necessary.
8. Excavation will be charged extra if encountered with water/loose soil/stone.
Ultimate
1. Compound wall, sump, septic tank, RWH, soak pits, tapered slabs, weathering course, main gate, safety grill gate, ladder, lofts, elevations with any cladding, CNC cutting, jaali, RCC/MS pergolas, projections, light fittings, landscaping, setback finish, chimney, lift, lift pit, circular/helical staircase, solar heater provision, CCTV wiring, pressure motor provision, meter board, ceiling lights will only be charged if required by the client. Any other specifications or works not exclusively mentioned above as per packages will only be charged additionally if required.
2. Large format tile laying (above 6’x4’), marble/laying will be charged additionally as per client’s requirement.
3. Water connection, borewell, EB connection, building and planning approval, corporation tax, electrical fittings, government/local body charges (i.e., political parties) will be in client’s scope. We can coordinate and help with liaison if required.
Area calculation:
4. Car parking will be charged 80% of the built-up area.
5. Headroom will be charged at 90% of the built-up area.
6. Measurements for the super built-up area will be taken jointly.
7. Site dewatering, site pooja and site cleaning will be charged only if necessary.
8. Excavation will be charged extra if encountered with water/loose soil/stone.
Desarc is a construction and interior design company based in Chennai, offering services for residential and commercial spaces.